Greenopolis

Greenopolis

2 BHK 1297-1660 Sq.Ft 81 Lacs - 1 Crore
3 BHK 1910-2070 Sq.Ft 1.18 Crore - 1.28 Crore

3c greenopolis, as its name suggests is an environment friendly unique residential project that aims to provide future residents not just well-planned homes but also focuses on the efficient use of energy, water and other building material in building an eco-friendly habitat. this innovatively designed residential complex comprises of ample open green areas, social spaces and infrastructure, all environment-friendly. this also ensures the well-being of the residents.

Read More

Greenopolis

SPECIFICATIONS

AREA WALLS FLOOR FALSE CEILING
DOORS
FINISH  HARDWARE
WINDOWS
SANITARY WARE
FIXTURES FITTINGS
LIVING & 
DINING
Oil Bound
Distemper
High end
vitrified tiles
No Veneered
Door
Dorset UPVC Window/
Aluminum
Window
- -
PASSAGE Oil Bound
Distemper
High end
vitrified tiles
No - - UPVC Window
/ Aluminum
Window
- -
BEDROOMS Oil Bound
Distemper
Laminated
Wooden
Flooring
(Imported)
No Skin Door Dorset UPVC Window
/ Aluminum
Window
- -
TOILETS Ceramic Tiles
cladded up to2100
from Finish Floor
level
Kajaria / Somany
Ceramic Tiles
300 x 300
Kajaria /
Somany
Yes Skin Door Dorset UPVC Window
/ Aluminum
Window
Wash
Basin and
WC from
Hindware
Fittings
from
Jaquar/
equivalent
Single Lever
Fittings in
Master
Toilet and
Quarter
Turn
Fittings in
other
Toilets
KITCHEN Ceramic Tiles
cladding 600
high above the
working counter
Kajaria / Somany
Ceramic Tiles
300 x 300
Kajaria /
Somany
No Skin Door Dorset UPVC Window
/ Aluminum
Window
Sink from
Jayna
Wall
Mounted
Fittings
from
Jaquar/
equivalent
UTILITY External Paint Ceramic Tiles
300 x 300
Kajaria /
Somany
No UPVC
Doors /
Aluminum
Doors
As per
section
UPVC Window
/ Aluminum
Window
- -
BALCONIES External Paint Ceramic Tiles
300 x 300
Kajaria /
Somany
No UPVC
Doors /
Aluminum
Doors
As per
section
UPVC Window
/ Aluminum
Window
- -
SERVANT
ROOM
Oil Bound
Distemper
Ceramic Tiles
300 x 300
Kajaria /
Somany
No Skin Door Dorset UPVC Window
/ Aluminum
Window
- -
SERVANT
TOILET
Oil Bound
Distemper
Ceramic Tiles
300 x 300
Kajaria /
Somany
YES UPVC
Doors /
Aluminum
Doors
As per
section
UPVC Window
/ Aluminum
Window
Anglo-
Indian
WC from
Hindware
-
Amenities
Greenopolis Power Backup

Power Backup

Greenopolis Lift

Lift

Greenopolis Security

Security

Greenopolis Gymnasium

Gymnasium

Greenopolis Internal Road

Internal Road

Greenopolis Jogging track

Jogging track

Specification
AREA WALLS FLOOR FALSE CEILING
DOORS
FINISH  HARDWARE
WINDOWS
SANITARY WARE
FIXTURES FITTINGS
LIVING & 
DINING
Oil Bound
Distemper
High end
vitrified tiles
No Veneered
Door
Dorset UPVC Window/
Aluminum
Window
- -
PASSAGE Oil Bound
Distemper
High end
vitrified tiles
No - - UPVC Window
/ Aluminum
Window
- -
BEDROOMS Oil Bound
Distemper
Laminated
Wooden
Flooring
(Imported)
No Skin Door Dorset UPVC Window
/ Aluminum
Window
- -
TOILETS Ceramic Tiles
cladded up to2100
from Finish Floor
level
Kajaria / Somany
Ceramic Tiles
300 x 300
Kajaria /
Somany
Yes Skin Door Dorset UPVC Window
/ Aluminum
Window
Wash
Basin and
WC from
Hindware
Fittings
from
Jaquar/
equivalent
Single Lever
Fittings in
Master
Toilet and
Quarter
Turn
Fittings in
other
Toilets
KITCHEN Ceramic Tiles
cladding 600
high above the
working counter
Kajaria / Somany
Ceramic Tiles
300 x 300
Kajaria /
Somany
No Skin Door Dorset UPVC Window
/ Aluminum
Window
Sink from
Jayna
Wall
Mounted
Fittings
from
Jaquar/
equivalent
UTILITY External Paint Ceramic Tiles
300 x 300
Kajaria /
Somany
No UPVC
Doors /
Aluminum
Doors
As per
section
UPVC Window
/ Aluminum
Window
- -
BALCONIES External Paint Ceramic Tiles
300 x 300
Kajaria /
Somany
No UPVC
Doors /
Aluminum
Doors
As per
section
UPVC Window
/ Aluminum
Window
- -
SERVANT
ROOM
Oil Bound
Distemper
Ceramic Tiles
300 x 300
Kajaria /
Somany
No Skin Door Dorset UPVC Window
/ Aluminum
Window
- -
SERVANT
TOILET
Oil Bound
Distemper
Ceramic Tiles
300 x 300
Kajaria /
Somany
YES UPVC
Doors /
Aluminum
Doors
As per
section
UPVC Window
/ Aluminum
Window
Anglo-
Indian
WC from
Hindware
-
Price List
Basic Sale Price As applicable
EDC/IDC Rs. 330/- SQ.FT
Club Membership Rs.1,50,000/-
PLC Exclusive Parking Space Charge Rs. 3,00,000/-
Ground Floor Rs. 200/- SQ.FT
1st, 2nd & 3rd Floor Rs. 150/- SQ.FT
4th, 5th, 6th & 7th Floor Rs. 100/- SQ.FT
Landscape Facing Rs. 100/- SQ.FT
Interest Free Maintenance Security Deposit (IFMSD) Rs. 50/- SQ.FT
Payment Plan
Payment Plan (Towers 1,2,3,4,7,8,9,12,14,15,16,17,18,20,21,22,23,29)
DOWN PAYMENT PLAN - A (REBATE 10 % ON BSP)
On application for booking 10% of BSP
Within 45 days from Allotment 85% of BSP + Exclusive Parking Space Charges + PLC + Club Membership + EDC +IDC
At the time of Notice for possession 5% of BSP + IFMS + Other Charges
CONSTRUCTION LINKED PAYMENT PLAN - B
On application for Booking 10% of BSP
Within 30 days from Allotment 10% of BSP
Within 65 days from Allotment 10% of BSP
On Completion of Ground Floor roof slab 10% of BSP + 50% Exclusive Parking Space Charges
On Completion of 3rd floor roof slab 7.5% of BSP + 50% Exclusive Parking Space Charges
On Completion of 5th floor roof slab 7.5% of BSP + 50% PLC
On Completion of 8th floor roof slab 7.5% of BSP + 50% PLC
On Completion of 10th floor roof slab 7.5% of BSP + 50% (IDC + EDC)
On casting of Top Floor Roof Slab 7.5% of BSP + 50% (IDC + EDC)
On completion of Masonry work 7.5% of BSP + Club membership
On completion of Internal & External Plaster 5% of BSP
On completion of Wiring 5% of BSP
At the time of notice for possession 5% of BSP + 100% IFMS + Other Charges
Payment Plan ( Towers - 5,12A,27,28)
DOWN PAYMENT PLAN - A (REBATE 10 % ON BSP)
On application for booking 10% of BSP
Within 45 days from Allotment 85% of BSP + Exclusive Parking Space Charges + PLC + Club Membership + EDC +IDC
At the time of Notice for possession 5% of BSP + IFMS + Other Charges
CONSTRUCTION LINKED PAYMENT PLAN - B
On application for Booking 10% of BSP
Within 30 days from Allotment 10% of BSP
Within 65 days from Allotment 10% of BSP
On Completion of Ground Floor roof slab 10% of BSP + 50% Exclusive Parking Space Charges
On Completion of 5th floor roof slab 7.5% of BSP + 50% Exclusive Parking Space Charges
On Completion of 10th floor roof slab 7.5% of BSP + 50% PLC
On Completion of 15th floor roof slab 7.5% of BSP + 50% PLC
On Completion of 20th floor roof slab 7.5% of BSP + 50% (IDC + EDC)
On casting of Top Floor Roof Slab 7.5% of BSP + 50% (IDC + EDC)
On completion of Masonry Work 7.5% of BSP + Club membership
On completion of Internal & External plaster 5% of BSP
On completion of Wiring 5% of BSP
At the time of notice for possession 5% of BSP + 100% IFMS + Other Charges
Payment Plan ( Towers - 10,11)
DOWN PAYMENT PLAN – A (REBATE 10 % ON BSP)
On application for booking 10% of BSP
Within 45 days from Allotment 85% of BSP + Exclusive Parking Space Charges + PLC + Club Membership + EDC +IDC
At the time of Notice for possession 5% of BSP + IFMS + Other Charges
CONSTRUCTION LINKED PAYMENT PLAN - B
On application for Booking 10% of BSP
Within 30 days from Allotment 10% of BSP
Within 65 days from Allotment 10% of BSP
On Completion of Ground Floor roof slab 10% of BSP + 50% Exclusive Parking Space Charges
On Completion of 3rd floor roof slab 7.5% of BSP + 50% Exclusive Parking Space Charges
On Completion of 5th floor roof slab 7.5% of BSP + 50% PLC
On Completion of 7th floor roof slab 7.5% of BSP + 50% PLC
On Completion of 9th floor roof slab 7.5% of BSP + 50% (IDC + EDC)
On casting of Top Floor Roof Slab 7.5% of BSP + 50% (IDC + EDC)
On completion of Masonry Work 7.5% of BSP + Club membership
On completion of Internal & External plaster 5% of BSP
On completion of Wiring 5% of BSP
At the time of notice for possession 5% of BSP + 100% IFMS + Other Charges
Payment Plan (Tower -19)
DOWN PAYMENT PLAN – A (REBATE 10 % ON BSP)
On application for booking 10% of BSP
Within 45 days from Allotment 85% of BSP + Exclusive Parking Space Charges + PLC + Club Membership + EDC +IDC
At the time of Notice for possession 5% of BSP + IFMS + Other Charges
CONSTRUCTION LINKED PAYMENT PLAN - B
On application for Booking 10% of BSP
Within 30 days from Allotment 10% of BSP
Within 65 days from Allotment 10% of BSP
On Completion of Ground Floor roof slab 10% of BSP + 50% Exclusive Parking Space Charges
On Completion of 3rd floor roof slab 7.5% of BSP + 50% Exclusive Parking Space Charges
On Completion of 6th floor roof slab 7.5% of BSP + 50% PLC
On Completion of 10th floor roof slab 7.5% of BSP + 50% PLC
On Completion of 14th floor roof slab 7.5% of BSP + 50% (IDC + EDC)
On casting of Top Floor Roof Slab 7.5% of BSP + 50% (IDC + EDC)
On completion of Masonry 7.5% of BSP + Club membership
On completion of Internal & external plaster 5% of BSP
On completion of wiring 5% of BSP
At the time of notice for possession 5% of BSP + 100% IFMS + Other Charges
Payment Plan (Tower - 24,26)
DOWN PAYMENT PLAN – A (REBATE 10 % ON BSP)
On application for booking 10% of BSP
Within 45 days from Allotment 85% of BSP + Exclusive Parking Space Charges + PLC + Club Membership + EDC +IDC
At the time of Notice for possession 5% of BSP + IFMS + Other Charges
CONSTRUCTION LINKED PAYMENT PLAN - B
On application for Booking 10% of BSP
Within 30 days from Allotment 10% of BSP
Within 65 days from Allotment 10% of BSP
On Completion of Ground Floor roof slab 10% of BSP + 50% Exclusive Parking Space Charges
On Completion of 2nd floor roof slab 10% of BSP + 50% Exclusive Parking Space Charges
On Completion of 4th floor roof slab 10% of BSP + 50% PLC
On Completion of Top floor roof slab 10% of BSP + 50% PLC
On completion of Masonry work 10% of BSP + Club membership
On completion of Internal & external plaster 10% of BSP + 50% (IDC + EDC)
On completion of Wiring 5% of BSP + 50% (IDC + EDC)
At the time of notice for possession 5% of BSP + 100% IFMS + Other Charges
Payment Plan (Tower -25)
DOWN PAYMENT PLAN – A (REBATE 10 % ON BSP)
On application for booking 10% of BSP
Within 45 days from Allotment 85% of BSP + Exclusive Parking Space Charges + PLC + Club Membership + EDC +IDC
At the time of Notice for possession 5% of BSP + IFMS + Other Charges
CONSTRUCTION LINKED PAYMENT PLAN - B
On application for Booking 10% of BSP
Within 30 days from Allotment 10% of BSP
Within 65 days from Allotment 10% of BSP
On Completion of Ground Floor roof slab 12.5% of BSP + 50% Exclusive Parking Space Charges
On Completion of 2nd floor roof slab 12.5% of BSP + 50% Exclusive Parking Space Charges
On Completion of Top floor roof slab 10% of BSP + 100% PLC
On completion of Masonry work 10% of BSP + Club membership
On completion of Internal & External Plaster 10% of BSP + 50% (IDC + EDC)
On completion of wiring 10% of BSP + 50% (IDC + EDC)
At the time of notice for possession 5% of BSP + 100% IFMS + Other Charges
Notes :
  • Prices are Escalation free but subject to revision/withdrawal without notice at company’s sole discretion.
  • Service tax shall be payable as per the Government rules and regulations.
  • Stamp Duty, Registration Charges, Legal/miscellaneous expenses etc., shall be payable by the Allottee at the time of offer of possession.
  • Prices, terms and conditions stated herein are merely indicative with a view to acquaint the applicant and are not exhaustive. For detailed terms and conditions please refer to the application form and Flat Buyer’s Agreement.
  • Membership of club is mandatory.
  • The above instalment plan shall become payable on demand irrespective of the order in which they are listed.

 



SIMILAR PROJECTS

HOT PROJECTS

SEARCH PROPERTY

Modify Search
Unit of GTF Technologies
Disclaimer: Propfrill.com is a platform which acts a medium for allowing people having converging interests involving real estate transactions, namely the buyer/tenant and owner/broker.Propfrill.com is merely a preliminary medium of contact and exchange of information, users are strongly advised to have independent third party verifications (whether marked verified or not) prior to proceeding with any transactions involving real estate. The onus of finding a genuine property, be it for purchase or rental purpose, lies on the user. This website is meant only for information purposes. It should not be considered/ claimed as an official site...    Read More...