Woodview Residences

Woodview Residences

2 BHK 1090-4362 Sq.Ft 70 Lacs - 97 Lacs
3 BHK 1740-3360 Sq.ft 1.10 Crore - 2.60 Crore

Woodview Residences is a green paradise that offers 2BHK, 3BHK and 4.5BHK low-rise terrace homes and commercial shops. These homes are jointly developed by Orris Infrastructure and Lotus Greens presents super luxury homes in Gurgaon. The enveloping landscapes are a refreshing sight from the terrace balconies. Treat yourself to reflexology walks and spend time on the yoga lawn; children can enjoy being one with Nature in the sandboxes and crawler's area. The project is a great choice for the buyers as it is a perfect blend of beauty and modern amenities and proximity to several prestigious gated communities, schools, and shopping malls. 

Read More

Woodview Residences

SPECIFICATIONS

Specifications
Drawing / Dining
Flooring Imported Marble
Wall Pop Punning with Healthy Acrylic emulsion Paint
Ceiling Oil Bound Distemperwith designer cornice
Master Bedroom
Flooring Engineered Hardwood
Wall Pop Punning with Healthy Acrylic emulsion Paint
Ceiling Oil Bound Distemperwith designer cornice
Bedrooms
Flooring Laminated Wooden Flooring
Wardrobes ModularWardrobeswith imported hardware
Wall Pop Punning with Healthy Acrylic emulsion Paint
Ceiling Oil Bound Distemperwith designer cornice
Kitchen
Flooring Imported Marble
Kitchen International Style Moduler Kitchen with Exhaust, Hob and Chimney, Granite counter top, stainless steel sink and cp fittings
Wall Dado/Tiles up to 2 feet above the counter and rest Healthy Acrylic Emulsion Paint
Ceiling Oil Bound Distemperwith designer cornice
Toilets
Flooring Matt Finish Homogeneous Ceramic Tiles Tiles/Vitrified Tiles
Wall Digital Ceramic Tiles
Fittings & Fixtures Jaguar / Grohe / Duravit / Kohler / equivalent
Ceiling OBD / False Ceiling / MR Board
Basement
Flooring Matt finished Ceramic / Vitrified Tiles
Wall OBD
Ceiling OBD
Balcony
Flooring Matt finished Anti Skid Ceramic Tiles
Wall Weather Proof External Texture paint
Ceiling OBD
Railing SS with Glass on front side MS Railing on the rear side
Staircase
Flooring Granite Flooring
Wall External Texture paint MS Handrail with hardwood tops
Stilt
Flooring Heavy duty antiskid tiles I Cobble Stone in parking area. Hardscape /Softscape as per design.
Wall External Texture paint
Ceiling OBD
General
HVAC VRV/VRF AC Units
DG 100% Power Backup
Electrical Fixtures Light Fittings in common areas & balconies only Copperwiring in PVC Conduits
Elevator Branded MRLtype
Door Veener Finish flush door /Skin moulded panel door
Windows/ Glazings Elevational Elements UPVC glazing with tough ned Glass
Entrance Lobby door Door with Video phone

 

Amenities
Woodview Residences Power Backup

Power Backup

Woodview Residences Lift

Lift

Woodview Residences Gymnasium

Gymnasium

Woodview Residences Security

Security

Woodview Residences Green-Garden

Green-Garden

Woodview Residences Internal Road

Internal Road

Woodview Residences Jogging track

Jogging track

Woodview Residences Play area

Play area

Specification
Specifications
Drawing / Dining
Flooring Imported Marble
Wall Pop Punning with Healthy Acrylic emulsion Paint
Ceiling Oil Bound Distemperwith designer cornice
Master Bedroom
Flooring Engineered Hardwood
Wall Pop Punning with Healthy Acrylic emulsion Paint
Ceiling Oil Bound Distemperwith designer cornice
Bedrooms
Flooring Laminated Wooden Flooring
Wardrobes ModularWardrobeswith imported hardware
Wall Pop Punning with Healthy Acrylic emulsion Paint
Ceiling Oil Bound Distemperwith designer cornice
Kitchen
Flooring Imported Marble
Kitchen International Style Moduler Kitchen with Exhaust, Hob and Chimney, Granite counter top, stainless steel sink and cp fittings
Wall Dado/Tiles up to 2 feet above the counter and rest Healthy Acrylic Emulsion Paint
Ceiling Oil Bound Distemperwith designer cornice
Toilets
Flooring Matt Finish Homogeneous Ceramic Tiles Tiles/Vitrified Tiles
Wall Digital Ceramic Tiles
Fittings & Fixtures Jaguar / Grohe / Duravit / Kohler / equivalent
Ceiling OBD / False Ceiling / MR Board
Basement
Flooring Matt finished Ceramic / Vitrified Tiles
Wall OBD
Ceiling OBD
Balcony
Flooring Matt finished Anti Skid Ceramic Tiles
Wall Weather Proof External Texture paint
Ceiling OBD
Railing SS with Glass on front side MS Railing on the rear side
Staircase
Flooring Granite Flooring
Wall External Texture paint MS Handrail with hardwood tops
Stilt
Flooring Heavy duty antiskid tiles I Cobble Stone in parking area. Hardscape /Softscape as per design.
Wall External Texture paint
Ceiling OBD
General
HVAC VRV/VRF AC Units
DG 100% Power Backup
Electrical Fixtures Light Fittings in common areas & balconies only Copperwiring in PVC Conduits
Elevator Branded MRLtype
Door Veener Finish flush door /Skin moulded panel door
Windows/ Glazings Elevational Elements UPVC glazing with tough ned Glass
Entrance Lobby door Door with Video phone

 

Price List
Price List
Size (Sq. Yd) Floor Unit Area (Sq. Ft) Terrace (Sq. Ft) Basement (Sq. Ft) Total Sale Area (Sq. Ft) Total Basic Cost (Rs. lacs) Booking Amount
183 UGF 1,090     1,090 82.84 8 Lacs
FF/SF 1,090     1,090 78.48
FF/SF 1,090 492   1,582 91.83
239 UGF 1,415   1,083 2,498 140.87 8 Lacs
FF/SF 1,415 325   1,740 113.58
303 UGF 1,685   1,313 2,998 168.59 8 Lacs
FF/SF 1,685 394   2,079 135.50
359 UGF 1,875   1,485 3,360 188.46 8 Lacs
FF/SF 1,875 446   2,321 151.06
502 UGF 2,435   1,927 4,362 244.69 8 Lacs
FF/SF 2,435 578   3,013 196.13
Payment Plan
Down Payment Plan (10% Rebate)
Project Milestones Structure Payments
Booking Booking Amount
Within 60 Days from the date of booking Complete 91.5% of Basic Cost + 100% of (PLC + Club Mumbership + EDC+IDC)
On offer of Possession 8.5% of Basic Cost + IFMS + Other Regulatory Authority Charges
Subvention Payment Plan
Booking 8 Lacs
30 Days from Allotment 10% of Total Cost* - Booking Amount
Bank Disbursement 75% of Total Cost*
On offer of Possession 15% of Total Cost* + IFMS + PBC + Registration Charges + Stamp Duty + Other Charges.
Possession Likned Plan
Booking 8 Lacs
Within 30 days 10% of BSP- Booking Amount
Within 90 days 10% of BSP
Within 180 days of booking 10% of BSP + 100% of EDC/IDC
On completion of Super Structure or 18 Months (Whichever is later) 40% of BSP + 100% of PLC
On offer of Possession or 30 Months (Whichever is later) 30% of BSP +Club Membership+ IFMS +Stamp Duty+ Registration Cost+ All Other Charges


SIMILAR PROJECTS

HOT PROJECTS

SEARCH PROPERTY

Modify Search
Unit of GTF Technologies
Disclaimer: Propfrill.com is a platform which acts a medium for allowing people having converging interests involving real estate transactions, namely the buyer/tenant and owner/broker.Propfrill.com is merely a preliminary medium of contact and exchange of information, users are strongly advised to have independent third party verifications (whether marked verified or not) prior to proceeding with any transactions involving real estate. The onus of finding a genuine property, be it for purchase or rental purpose, lies on the user. This website is meant only for information purposes. It should not be considered/ claimed as an official site...    Read More...